Had hung the fan coil
The indoor part of the cooling system is ready
Had drawn some stripes
It's not that necessary, but it looks cool
Racks've arrived
Rack for a paranoid. Cooling is a different story, but one can close and seal
UPS batteries have arrived too
Heavy as hell
Almost a data center
Looks almost like a data center
Our staff is bringing in the racks
A hundred left to bring in so far...
Mounting wire decks
It's a wire basket for electric wires
Setting up a cooling system
Tanked up, configured, launched - it's cold!
The main switch
The real main switch is to the left, but "no-so-main switch" doesn't sound cool
Chillers
Mounted on a roof, just above the data center
Chillers etc
The same thing, side view
400-kilowatt generator
Not enough, but we have another for 160kW